The West Dimond Blvd. Upgrade Phase I: Westpark Drive to Sand Lake Road is at 95% Design. The plan documents are available below for public and agency review. If you would like more information or have questions about the 95% Design plans, please contact a member of the project team.
95% Design Plans
1. 95% Design – Index, Key, Legend
2. 95% Design – Survey and Right-Of-Way
4. 95% Design – Typical Section, Plan and Profile, Drainage
5. 95% Design – Grading, Driveways, and Details